  1. Spruce Court

    March 2021 updates – W/C 1st March:

    • Installation of canopies to mast climbers
    • Installation of fixings to window pods
    • Brick tie investigations – will involve the localised removal of brick work.
    • Flat 207 – Internal repairs and making good.
    • Flat 207 – external intrusive surveys of SFS
    • Sample concrete repairs to floor slab edges
    • Installation of fire marshal viewing windows to hoarding.
    • Installation of ply to close gap between working platform & building
  1. Thorn Court

    March 2021 Updates – W/C 1st March:

    • Installation of canopies to mast climbers
    • Installation of fixings to window pods
    • Brick tie investigations – will involve the localised removal of brick work.
    • Sample concrete repairs to floor slab edges – will involve drilling and grinding
    • Box steel installation prep works
  1. Malus Court

    March 2021 Updates – W/C 1st March:

    • Waterproofing of front elevation will take 4 to 5 weeks
    • 7-day inspection of parapet capping
  1. Salix Court

    March 2021 Updates – W/C 1st March:

    • Mastic sealing to ground floor doors and windows
    • Temporary strapping installation to roof cappings
    • 7-day inspection of parapet cappings
  1. Hornbeam Court

    March 2021 Updates – W/C 1st March:

    • Brick tie surveys to all elevations and all levels
    • Brick repairs to ground floor – will involve drilling and grinding
    • Apply mastic seal to doors and windows following brick slip removal.
  1. Beech Court

    March 2021 Updates – W/C 1st March:

    • Temporary strapping installation to roof cappings
    • 7- day inspection of parapet cappings
    • Apply mastic seal to doors and windows following brick slip removal.
  1. Whitebeam

    March 2021 Updates – W/C 1st March:

    • Brick repairs to ground floor – will involve drilling and grinding
    • Apply mastic seal to doors and windows following brick slip removal.
  1. Holm Court

    March 2021 Weekly Updates – W/C 1st March:

    • Apply mastic seal to doors and windows following brick slip removal.
    • Brick surveys & brick repairs
    • Closure of 2no parking space will be required to allow machine access as previously
    • Wintec external surveys
    • Temporary strapping installation to roof cappings
    • 7-day inspection of parapet cappings
    • Closure of pedestrian access Brotherton gable – 8am- 5pm. Full time banksman in attendance
  1. Plane Court

    March 2021 Weekly Updates – W/C 1st March:

    • Temporary strapping installation to roof capping
    • Flat 30 – PE surveys potentially external investigation at the property
    • Apply mastic seal to doors and windows following brick slip removal.